Clear filters
Expand All
Collapse All

We found 20908 search results for 'TransAdelaide - Replacement Pages':

For performance, only the first 1,000 results can be browsed. Refine your search to narrow the results.

  • Replacement of the software has commenced.
    Presented
    on
    09/02/1999
  • support of the AWD project. 3.9 The Project works focus on preparing land within the Precincts for sale and/or lease of ‘development-ready’ land to private sector over the next two years, with construction and completion of built form upon the land within five years. 3.10 The type and quality of built form within these Precincts will be controlled by Defence SA through the enforcement of development guidelines covering planning, building and environmental sustainability requirements. 3.11 South Australia has a unique opportunity to leverage from the $8 billion AWD project – coupled with ASC’s existing 25-year billion contract to maintain the Collins class submarine fleet and the State’s investment at Techport Australia – to create an internally competitive naval and commercial shipbuilding and repair industry in South Australia. 3.12 The State’s infrastructure investment will strengthen its position in attracting future naval and complementary construction, replacement
  • SUPPLIER PRECINCT Legal Description Road Former Owner Size Lot 207 in Deposited Plan 64682 (part) Mersey Minister for Environment and Conservation 92.94h a COMMERCIAL PRECINCT (TWO SITES) Lot 501 in Deposited Plan 71772 Mersey Land Management Corporation 4.236h a Lot 16 in Deposited Plan 68407 Victoria Minister for Environment and Conservation 3.84ha Lot 46 in Filed Plan 5774 Osborne Department of Transport, Energy and Infrastructure 457m2 Lots 38, 39, 40, 41, 42 and 43 in Deposited Plan 3003 Osborne TransAdelaide 4550m2 Lot 47 in Filed Plan 5774 Osborne TransAdelaide 1059m2 Lot 51 in DP 61947 Osborne TransAdelaide 2255m2 Public Works Committee Techport Australia Precinct Development 6 2.1 The Current Proposal (cont.)
  • Committee Hansard -6 October 2004 (pdf 490 KB)

    TransAdelaide at the present time, of course, is solely passenger rail.
  • Tabled Paper Snowtown Area School (Replacement) (pdf 370 KB)

    SOUTH AUSTRALIA REPORT OF THE [P.P. 76 Parliamentary Standing Committee on Public Works ON SNOWTOWN AREA SCHOOL (REPLACEMENT) Minutes of Evidence not printed Ordered by the House of Assembly to be printed, 18th July, 1972 BY AUTHORITY: A.
    Presented
    on
    18/07/1972
  • SUPPLIER PRECINCT Legal Description Road Former Owner Size Lot 207 in Deposited Plan 64682 (part) Mersey Minister for Environment and Conservation 92.94h a COMMERCIAL PRECINCT (TWO SITES) Lot 501 in Deposited Plan 71772 Mersey Land Management Corporation 4.236h a Lot 16 in Deposited Plan 68407 Victoria Minister for Environment and Conservation 3.84ha Lot 46 in Filed Plan 5774 Osborne Department of Transport, Energy and Infrastructure 457m2 Lots 38, 39, 40, 41, 42 and 43 in Deposited Plan 3003 Osborne TransAdelaide 4550m2 Lot 47 in Filed Plan 5774 Osborne TransAdelaide 1059m2 Lot 51 in DP 61947 Osborne TransAdelaide 2255m2 Public Works Committee Techport Australia Precinct Development 6 2.1 The Current Proposal (cont.)
  • Committee Hansard -6 October 2004 (pdf 490 KB)

    TransAdelaide at the present time, of course, is solely passenger rail.
  • • Replacement of the Bakewell Bridge
    Presented by
    Hon Trish White AM
    on
    09/11/2004
  • SUPPLIER PRECINCT Legal Description Road Former Owner Size Lot 207 in Deposited Plan 64682 (part) Mersey Minister for Environment and Conservation 92.94h a COMMERCIAL PRECINCT (TWO SITES) Lot 501 in Deposited Plan 71772 Mersey Land Management Corporation 4.236h a Lot 16 in Deposited Plan 68407 Victoria Minister for Environment and Conservation 3.84ha Lot 46 in Filed Plan 5774 Osborne Department of Transport, Energy and Infrastructure 457m2 Lots 38, 39, 40, 41, 42 and 43 in Deposited Plan 3003 Osborne TransAdelaide 4550m2 Lot 47 in Filed Plan 5774 Osborne TransAdelaide 1059m2 Lot 51 in DP 61947 Osborne TransAdelaide 2255m2 Public Works Committee Techport Australia Precinct Development 6 2.1 The Current Proposal (cont.)
  • [P.P. 118 SOUTH AUSTRALIA REPORT OF THE Parliamentary Standing Committee on Public Works ON East Adelaide Primary School Replacement Minutes of evidence not printed Ordered by the House of Assembly to be printed, 6th October, 1977 BY AuTHOiiTY: D.
    Presented
    on
    06/10/1977
Acknowledgement of Country

The Parliament of South Australia acknowledges Aboriginal and Torres Strait Islander peoples as the traditional owners of this country throughout Australia, and their connection to land and community. We pay our respect to them and their cultures and to the Elders both past and present.