We found 20465 search results for 'TransAdelaide - Replacement Pages':
For performance, only the first 1,000 results can be browsed. Refine your search to narrow the results.
-
More than half of the employees in other
South Australian public sector organisations were employed within the South Australian
health sector, with significant numbers also employed by the Universities, the Electricity
Trust of South Australia, TransAdelaide, SA Water Corporation, the South Australian
Metropolitan Fire Service and the South Australian Housing Trust.
-
Firstly, TransAdelaide had indicated that there
was a need to improve the disability access at the station and secondly, the proposed widening of
Torrens Road could not proceed without a reduction in the length of the platform at that station.
Standing Committees
55th Parliament
-
Stage 2 Phase 2 (Building Audit and Back of House Upgrade)
Requirements for the technical upgrade to the “Back of House” theatre equipment were evaluated
and a ten-year replacement program was developed, identifying the highest priority items required.
Standing Committees
55th Parliament
-
Members represent: the Department of Treasury and Finance,
TransAdelaide, Adelaide City Council, and the Department for Transport, Energy and
Infrastructure.
Standing Committees
56th Parliament (Current)
-
The Corporation also assesses the credit risk of derivatives on a market replacement risk basis using a formula that takes into
account the interest rate or exchange rate movements over the life of the derivative.
Presented by
Minister
on
02/10/2001
-
TransAdelaide modified tracks and the South Australian firm, Bardavcol, were
awarded the construction contract and work is scheduled to finish in early
2008.
Presented by
Hon Jack Snelling
on
12/02/2008
Document
Annual Report
51st Parliament
-
Pages )
Commtftees coup
Policy and
Strategic
Planning
Chairman's City Services
Corporate
Administration
.:41cOnck
NiFfK17.0.0.1
c ritc ITE,Tecutiki
-
occAcc,
-1.4.
Presented by
Hon Jack Snelling
on
12/02/2008
Document
Annual Report
51st Parliament
-
Ltd
Level 5
33 King William Street, Adelaide
SA 5000, AUSTRALIA
Tel: +61 8 8424 3800
Fax: +61 8 8424 3810
Web: www.skmconsulting.com
DATE: 28/05/09 SCALE: 1:10
ENGINEER/
DESIGNER
PROJECT
MANAGER
PROJECT
DIRECTOR
Government of South Australia
TransAdelaide
DESIGN
HD24210
Local Control System Cabinet Layout TypicalJD
JD
TD
BSIssued for client approval 28/05/09
X X
JD
JD
PM
1 of 1
Rev 0
499mm
1696mm
RTU
Remote
I/O
Alarm/Fire
Panel
Cable Duct
Circuit Breakers
Marshalling Terminal
Strip
Notes:
1) Cabinet Rittal ES5684.500
2) Cabinet Dimensions 1800h x 600w x 400d
3) Plinth Rittal 2904.200
4) Plinth Dimensions 100h
5) Mounting Plate Dimensions 1696 x 499
6) Custom built door in 2 sections as shown
7) Bottom door must be removable
Mounting Plate
HMI
600mm
540mm
1240mm
Removable door
Fixed door
Fibre Patch Panel
(future)
Ethernet Switch
Standing Committees
52nd Parliament
-
The first of these investments was the upgrade of the existing Glenelg tramline and replacement
of tram rolling stock with eleven new modern design trams.
Standing Committees
52nd Parliament
-
The age of this equipment means that it is unreliable as well obsolete as it is no
longer fully supported by equipment suppliers for the provision of replacement units or spare parts.
Standing Committees
55th Parliament