We found 20465 search results for 'TransAdelaide - Replacement Pages':
For performance, only the first 1,000 results can be browsed. Refine your search to narrow the results.
-
TransAdelaide modified tracks and the South Australian firm, Bardavcol, were
awarded the construction contract and work is scheduled to finish in early
2008.
Presented by
Hon Jack Snelling
on
12/02/2008
Document
Annual Report
51st Parliament
-
The first of these investments was the upgrade of the existing Glenelg tramline and replacement
of tram rolling stock with eleven new modern design trams.
Standing Committees
52nd Parliament
-
Ltd
Level 5
33 King William Street, Adelaide
SA 5000, AUSTRALIA
Tel: +61 8 8424 3800
Fax: +61 8 8424 3810
Web: www.skmconsulting.com
DATE: 28/05/09 SCALE: 1:10
ENGINEER/
DESIGNER
PROJECT
MANAGER
PROJECT
DIRECTOR
Government of South Australia
TransAdelaide
DESIGN
HD24210
Local Control System Cabinet Layout TypicalJD
JD
TD
BSIssued for client approval 28/05/09
X X
JD
JD
PM
1 of 1
Rev 0
499mm
1696mm
RTU
Remote
I/O
Alarm/Fire
Panel
Cable Duct
Circuit Breakers
Marshalling Terminal
Strip
Notes:
1) Cabinet Rittal ES5684.500
2) Cabinet Dimensions 1800h x 600w x 400d
3) Plinth Rittal 2904.200
4) Plinth Dimensions 100h
5) Mounting Plate Dimensions 1696 x 499
6) Custom built door in 2 sections as shown
7) Bottom door must be removable
Mounting Plate
HMI
600mm
540mm
1240mm
Removable door
Fixed door
Fibre Patch Panel
(future)
Ethernet Switch
Standing Committees
52nd Parliament
-
REPLACEMENT OF RAILS ON RAILWAY LINES.
-
CTId=3&CId=274
http://www.parliament.sa.gov.au/Committees/Pages/Committees.aspx?
Select Committees
52nd Parliament
-
The complex process of finalising the transfer of State railway heritage material from TransAdelaide to the
History Trust and appropriate heritage groups was bought to near - completion during the year thanks to the
efforts of Mr Frank McDonnell, the Trust's honorary adviser in this field.
-
Tabled Paper
Report
(pdf 1.01 MB)
Hon R B Such, Chairman
House of Assembly
APPROPRIATION BILL
REPORT FROM ESTIMATES COMMITTEE B - 2002
The following payments, proposed pursuant to the Appropriation Bill 2002, were considered:
Payment Schedule
Department of Industry and Trade 157 525 000
Administered items for Department of Industry and Trade 1 590 000
Department of Transport and Urban Planning 243 415 000
Administered items for Department of Transport and Urban Planning 13 980 000
Administered items for Planning SA 1 151 000
TransAdelaide 8 068 000
Minister for Local Government—other items 416 000
Department for Administrative and Information Services 150 952 000
Minister for Industrial Relations—other items 503 000
Department of Education and Children's Services and Department of 1 559 449 000
Employment, Further Education, Science and Small Business
Administered items for Department of Education and Children's 120 780 000
Services and Administered items for Department of Employment,
Further
Presented by
Ms Gay Thompson
on
13/08/2002
-
Ltd
Level 5
33 King William Street, Adelaide
SA 5000, AUSTRALIA
Tel: +61 8 8424 3800
Fax: +61 8 8424 3810
Web: www.skmconsulting.com
DATE: 28/05/09 SCALE: 1:10
ENGINEER/
DESIGNER
PROJECT
MANAGER
PROJECT
DIRECTOR
Government of South Australia
TransAdelaide
DESIGN
HD24210
Local Control System Cabinet Layout TypicalJD
JD
TD
BSIssued for client approval 28/05/09
X X
JD
JD
PM
1 of 1
Rev 0
499mm
1696mm
RTU
Remote
I/O
Alarm/Fire
Panel
Cable Duct
Circuit Breakers
Marshalling Terminal
Strip
Notes:
1) Cabinet Rittal ES5684.500
2) Cabinet Dimensions 1800h x 600w x 400d
3) Plinth Rittal 2904.200
4) Plinth Dimensions 100h
5) Mounting Plate Dimensions 1696 x 499
6) Custom built door in 2 sections as shown
7) Bottom door must be removable
Mounting Plate
HMI
600mm
540mm
1240mm
Removable door
Fixed door
Fibre Patch Panel
(future)
Ethernet Switch
Standing Committees
55th Parliament
-
[P.P. 1 78A
SOUTH AUSTRALIA
FINAL REPORT
OF THE
Parliamentary Standing Committee on Public Works
ON
Royal Adelaide Hospital
Replacement of Linear Accelerator
No. 2
Minutes of evidence not printed
Ordered by the House of Assembly to be printed, 11 October 1989
Fifth Session, Forty-Sixth Parliament
BY AUTHORITY: A.
-
Stage 2 Phase 2 (Building Audit and Back of House Upgrade)
Requirements for the technical upgrade to the “Back of House” theatre equipment were evaluated
and a ten-year replacement program was developed, identifying the highest priority items required.
Standing Committees
53rd Parliament