Clear filters
Expand All
Collapse All

We found 22907 search results for 'TransAdelaide - Replacement Pages':

For performance, only the first 1,000 results can be browsed. Refine your search to narrow the results.

  • Tabled Paper Motor Accident Commission (pdf 5.81 MB)

    TransAdelaide - MAC Nightmoves In 1998 -99, MAC continued its sponsorship of 'MAC Nightmoves' late night bus services provided by TransAdelaide.
    Presented
    on
    18/11/1999
  • Committee 22 Bailey (pdf 15 KB)

    The ABS figures for 2006 showed quite clearly that the birth rate was at 1.9 and rising at the time – the next figures will show that we are, in fact at replacement rate or better – so that with the current rate of immigration Australia and South Australia are far above replacement rate.
  • Overhead power is required for both the heritage (H-Class) trams and for the replacement rolling stock (Flexity trams).
    Presented by
    Hon Jack Snelling
    on
    27/04/2006
  • Presented by
    Hon Patrick Conlon
    on
    23/11/2011
  • The settlements, which are diverse in size and economic base, are located along the Eyre, Stuart and Barrier Highways, the Strzelecki, Oodnadatta and Birdsville Tracks, the Hawker - Lyndhurst Road and the Indian- Pacific and Ghan railways, as illustrated in the centre pages of this Report. 14 2.
    Presented
    on
    09/02/1999
  • Committee Hansard 25 July 2001 (pdf 392 KB)

    The 60 kilogram rail is designed as a replacement for the 53 kilogram rail and allows, certainly, a much higher standard. 58 MS THOMPSON: So who uses that?
  • With the development of a new single code to replace the 23,000 pages within development plans across the state, the issue of what to do about contributory items has become contested.
  • With the development of a new single code to replace the 23,000 pages within development plans across the state, the issue of what to do about contributory items has become contested.
  • Tabled Paper Report (pdf 911 KB)

    Glenelg Sewage Treatment Works - Replacement of Aeration and Power Generation Equipment
    Presented
    on
    19/11/1991
  • Tabled Paper South Australian Rail (pdf 733 KB)

    Figure 1 shows a map of the major railways in South Australia, with the majority of GWA owned railways separately identified. 2 The Passenger Transport (Transfer of Assets and Vesting of Rights and Liabilities) Proclamation 2010 transferred all real and personal property of TransAdelaide to the Rail Commissioner with effect from 1 September 2010.
    Presented by
    Hon Stephen Mullighan
    on
    01/11/2016
Acknowledgement of Country

The Parliament of South Australia acknowledges Aboriginal and Torres Strait Islander peoples as the traditional owners of this country throughout Australia, and their connection to land and community. We pay our respect to them and their cultures and to the Elders both past and present.