Clear filters
Expand All
Collapse All

We found 29994 search results for 'Legit Dumps Site : ':

For performance, only the first 1,000 results can be browsed. Refine your search to narrow the results.

  • Tabled Paper Local Governrment Act (pdf 2.24 MB)

    Fire Ban Days — Closure of Rubbish Dumps 5.
    Presented by
    Hon I P Lewis
    on
    17/02/2003
  • Tabled Paper Bushfires in South Australia (pdf 1.71 MB)

    WOODS AND FORESTS DEPARTMENT FIRE CAUSES FOR 10 YEAR PERIOD 1974 -75 to 1983 -84 Cause 1 1974 -75 1975 -76 1976 -77 1977 -78 1978 -79 1979 -80 1980 -81 1981 -82 1982 -83 1983 -84 Total Over 10 Years 10 Year Average Vehicles and Machinery' 14 5 10 11 8 11 19 5 9 12 104 10.4 Lightning 3 2 3 1 2 5 17 11 4 4 52 5.2 Burn-off Escapes, Rekindles 6 7 2 5 5 7 4 6 3 3 48 4.8 Campfires' 2 4 1 9 5 1 10 2 34 (8 yrs) 4.3 Incendiarism4 3 6 4 3 3 5 3 27 (7 yrs) 3.9 Waste Disposal (incl. rubbish dumps) . 1 3 3 8 3 2 4 1 2 2 29 2.9 Children' 3 1 1 1 6 (4 yrs) 1.5 Other Known6 32 12 7 14 10 7 7 5 8 7 109 10.9 Unknown 9 11 8 9 11 10 7 5 11 1 Total 65 40 35 55 46 55 69 38 53 35 491 49.1 Notes 1.
    Presented
    on
    12/02/1985
  • Committee Hansard 2000-03-01 Epagency (pdf 352 KB)

    While addressing technical aspects of site contamination assessment, it does not address the management of site contamination, which is the responsibility of states and territories to determine, and the bill on site contamination being prepared will compliment the national environment protection measure.
  • The Petitioners pray that this Honourable House will do all in its power to ensure that the proposal (as contained in an Amended Development Report for the development of Stage 2B of the Holdfast Shores Project on the Glenelg Foreshore), which includes a residential apartment building on the site of the Glenelg Surf Life Saving Club, is rejected.  
  • Tabled Paper Local Governrment Act (pdf 3.76 MB)

    • Site Value — the value of the land and any improvements which permanently affect the amenity of use of the land, such as drainage works, but excluding the value of buildings and other improvements
    Presented by
    Hon I P Lewis
    on
    17/02/2003
  • Tabled Paper Aboriginal Affairs Board S.A (pdf 6.64 MB)

    Very few Aborigines are engaged in actual mining operations, preferring to "noodle" the dumps.
    Presented
    on
    06/11/1969
  • On the Order of the Day being read for the adjourned debate on the question - That the Environment Protection (Site Contamination) Amendment Bill be now read a second time: ????????????????
  • Tabled Paper Budget 2015-2016 (pdf 2.11 MB)

    Also included in this program is government investment in a new set construction workshop on the Adelaide Studios’ site at Glenside.
    Presented by
    Hon Tom Koutsantonis
    on
    18/06/2015
  • Committee Acea - Risk Issues (pdf 290 KB)

    Individual Firm: Case Study 3 Excessive PI Cover required by Public Sector Clients Firm Size: Large firm employing over 300 staff Page 31 of 40 g:\33\0101099\acea\pwc consultants hearing\lrsg pi and risk allocation.doc 12/05/2003 9:45 AM Consultant Location: Melbourne, Victoria with offices around Australia and overseas Consultant Activity: Geotechnical engineering, site assessment and rehabilitation, environmental services Issues: Annual PI cover changed to project-specific PI cover The consulting firm is one of Australia’s leading service providers in its field.

  • (j) The environmental state of the Port Stanvac refinery site and the steps needed to ensure that the site is returned to an acceptable environmental state.
    Members: Mr Terry Roberts, Mr Nick Xenophon, Hon John Gazzola, Hon Angus Redford, Ms Kate Reynolds (McPhee), Hon Terry Stephens
Acknowledgement of Country

The Parliament of South Australia acknowledges Aboriginal and Torres Strait Islander peoples as the traditional owners of this country throughout Australia, and their connection to land and community. We pay our respect to them and their cultures and to the Elders both past and present.