We found 18190 search results for 'Legit Dumps Site : ':
For performance, only the first 1,000 results can be browsed. Refine your search to narrow the results.
-
On the inspection of the proposed site the Committee was accompanied by Mrs.
-
Tilt Renewables currently has the option to site the BESS on either the western or eastern sides of the
Snowtown Stage 1 Wind Farm substation.
Presented by
Hon Dan Cregan
on
05/12/2019
-
The site located on Oaklands Road is level, adjacent to the River Sturt and suitable for the proposed purpose.
-
Department for Education 3
0
0
Enrolments
2.5 Woodcraft Primary School had 596 enrolments based on February 2021 verified
census data.
3 SITE OWNERSHIP DETAILS
3.1 All works are to take place on the Woodcraft Primary School site.
3.2 There is one Certificate of Title for this site which is:
• Volume 6064 Folio 502.
3.3 This title is registered in the name of the Minister for Education.
Presented by
Mr Sam Duluk
on
28/10/2021
-
Site ownership details
All works will take place on the Banksia Park International High School site, for which there are three
Certificates of Title:
• Volume 6195 Folio 278
• Volume 6195 Folio 279
• Volume 6195 Folio 280.
Presented by
Hon Dan Cregan
on
30/04/2020
-
A Site Environmental Management Plan will be developed to address site-specific
environmental conditions.
Presented by
Ms Savvas
on
25/11/2025
-
Site construction employees will be inducted into the
requirements of this procedure.
3.4 Heritage Buildings
A heritage assessment was undertaken for the project site.
Presented by
Mrs Annabel Digance
on
08/03/2016
-
The subject matter is unchanged and is
as follows:
THE SITE
The site consists of a rectangular portion of land measuring 60 metres by 94 metres.
-
There are two Certificates of Title for this site, which are:
• Volume 5799 Folio 13
• Volume 5800 Folio 116.
Presented by
Hon Dan Cregan
on
24/03/2020
-
Site Ownership Details
All project works are to take place on the Port Augusta Secondary School site.
Presented by
Mr Josh Teague
on
02/02/2021