Clear filters
Expand All
Collapse All

We found 18190 search results for 'Legit Dumps Site : ':

For performance, only the first 1,000 results can be browsed. Refine your search to narrow the results.

  • Tabled Paper Enfield Community Welfare Centre (pdf 1.05 MB)

    On the inspection of the proposed site the Committee was accompanied by Mrs.
    Presented
    on
    22/03/1978
  • Tilt Renewables currently has the option to site the BESS on either the western or eastern sides of the Snowtown Stage 1 Wind Farm substation.
    Presented by
    Hon Dan Cregan
    on
    05/12/2019
  • The site located on Oaklands Road is level, adjacent to the River Sturt and suitable for the proposed purpose.
    Presented
    on
    27/07/1971
  • Department for Education 3 0 0 Enrolments 2.5 Woodcraft Primary School had 596 enrolments based on February 2021 verified census data. 3 SITE OWNERSHIP DETAILS 3.1 All works are to take place on the Woodcraft Primary School site. 3.2 There is one Certificate of Title for this site which is: • Volume 6064 Folio 502. 3.3 This title is registered in the name of the Minister for Education.
    Presented by
    Mr Sam Duluk
    on
    28/10/2021
  • Site ownership details All works will take place on the Banksia Park International High School site, for which there are three Certificates of Title: • Volume 6195 Folio 278 • Volume 6195 Folio 279 • Volume 6195 Folio 280.
    Presented by
    Hon Dan Cregan
    on
    30/04/2020
  • A Site Environmental Management Plan will be developed to address site-specific environmental conditions.
    Presented by
    Ms Savvas
    on
    25/11/2025
  • Site construction employees will be inducted into the requirements of this procedure. 3.4 Heritage Buildings A heritage assessment was undertaken for the project site.
    Presented by
    Mrs Annabel Digance
    on
    08/03/2016
  • Tabled Paper ADP Centre (Glenside) (Report No 2) (pdf 2.34 MB)

    The subject matter is unchanged and is as follows: THE SITE The site consists of a rectangular portion of land measuring 60 metres by 94 metres.
    Presented
    on
    01/06/1982
  • There are two Certificates of Title for this site, which are: • Volume 5799 Folio 13 • Volume 5800 Folio 116.
    Presented by
    Hon Dan Cregan
    on
    24/03/2020
  • Site Ownership Details All project works are to take place on the Port Augusta Secondary School site.
    Presented by
    Mr Josh Teague
    on
    02/02/2021
Acknowledgement of Country

The Parliament of South Australia acknowledges Aboriginal and Torres Strait Islander peoples as the traditional owners of this country throughout Australia, and their connection to land and community. We pay our respect to them and their cultures and to the Elders both past and present.