We found 18831 search results for 'Legit Dumps Site : ':
For performance, only the first 1,000 results can be browsed. Refine your search to narrow the results.
-
(f) Site works.
-
There is known
contaminated fill existing on the site, which needs to be considered and appropriately addressed as
part of the new development.
Presented by
Hon D R Cregan
on
06/02/2024
-
The girls school shares a very restricted site with the Nailsworth Primary School and is inadequate for
secondary school purposes.
-
There is no access to existing water and wastewater connections near the site of the new Thomas
Foods facility and on this basis, DTI engaged SA Water to deliver new water and wastewater supply
to the site.
Presented by
Hon Dan Cregan
on
23/09/2021
-
The site for this jetty is protected as far as the range of sea is concerned from any considerable " fetch "
in any direction ; the greatest likely disturbance that could be caused here would be from a south easterly
direction, where the sea would be driven direct on to the site from a distance of four miles.
-
The scope of the works include:
base building works;
fit-out works to the current buildings A, B, C, D and E to a maximum of $6 million
(excluding GST);
construction of a new building for storage, a structure to link the store with Building D, a
bicycle storage facility and an outbuilding (capped cost of $2 million, excluding GST); and
civil works to facilitate semi-trailer’s to enter the site from Park Way and to exit the site on
to Second Avenue.
Presented by
Mrs Annabel Digance
on
05/05/2015
-
• In 2022–23 accredited site auditors issued 221 site audit statements following 169 statutory audits and
52 non-statutory audits under the Act
Presented by
Hon L P Hood
on
02/06/2026
Document
Annual Report
56th Parliament (Current)
-
(2) Unless the contrary intention appears, words and phrases defined in section
20 of the Act have the same respective meanings in this Subdivision (and
in clause 3 of Schedule 3) as in that section.
4A—Section 20 of Act not applicable to short term low impact works
or certain fire, ambulance, breakdown or other services etc
(1) Section 20 of the Act does not apply to or in relation to—
(a) a public authority or a contractor engaged by a public authority, or
an employee of a public authority or of such a contractor, in
relation to a work area or work site where workers are engaged at
the direction of that authority, contractor or employee to carry out
short term low impact works, provided that—
(i) the public authority, contractor or employee complies
with Section 8.2 of the Workzone Traffic Management
Standards; and
(ii) the works are not carried out—
(A) between the hours of 7 am and 9 am, Monday to
Friday (inclusive); or
(B) between the hours of 4 pm
Presented by
Hon Corey Wingard
on
16/03/2021
-
There are several prefabricated school buildings on the site and some of these are in a bad condition.
-
Site Contamination Auditor Accreditation Committee
The Site Contamination Auditor Accreditation Committee was established in August 2008 to advise the Board on the
accreditation of site contamination auditors.
Presented by
Hon Paul Caica
on
10/11/2011
Document
Annual Report
52nd Parliament