-
DRAINAGE
Drainage infrastructure will be improved to manage stormwater flows through the project site.
Presented by
Hon N F Cook
on
05/05/2026
Document
56th Parliament (Current)
-
SITE OWNERSHIP DETAILS 5
5.
Presented by
Hon N F Cook
on
05/05/2026
Document
56th Parliament (Current)
-
The present school site is of 2.142 hectares.
-
The induction should ensure that any site
specific environmental controls and/or requirements associated with Aboriginal Heritage are
communicated to staff prior to the commencement of on-site works.
Presented by
Hon Vincent Tarzia
on
03/05/2018
-
Site of New School.
-
I attended Yatala Labour Prison on one occasion to familiarise myself with the site.
Presented by
Hon J K Szakacs
on
06/02/2024
Document
Annual Report
55th Parliament
-
The site difficulties and soil conditions mean that there is a cost premium for this school
compared with standard costs for a primary school on a level site with stable soils.
-
Where
sub-projects are delivered under partnership frameworks contractors will be required to establish
Construction Environmental Management Plans, and Site Environmental Plans will be developed to
address site specific environmental management requirements.
Presented by
Hon M E Brown
on
10/09/2024
-
-I consider it a bad site.
2376.
-
GAP or recycled water is not available at the site.
Presented by
Hon Paul Caica
on
30/11/2017