The project aims to deliver 22 two-bedroom apartments, along with on-site car parking.
Presented by
Hon L P Hood
on
04/02/2025
-
Department for Education 3
0
Enrolments
2.5 West Lakes Shore School R-7 had 604 enrolments based on February 2021
verified census data.
3 SITE OWNERSHIP DETAILS
3.1 All works are to take place on the West Lakes Shore School R-7 site.
3.2 There is one Certificate of Title for this site which is:
• Volume 5417 Folio 189.
3.3 This title is registered in the name of the Minister for Education.
Presented by
Mr Sam Duluk
on
28/10/2021
-
The relocation will enable the construction of the new Women’s and
Children’s Hospital (nWCH) at the Thebarton site.
Presented by
Hon M E Brown
on
13/09/2023
-
This unit will be a new built
component adjacent to the emergency department created as part of Stage A
Car parking and Site Works
The proposal provides additional permanent car parks on the LMH site and bordering streets to
meet current and anticipated demand associated with providing access to services on the site
Presented by
Ms Vini Ciccarello
on
22/11/2006
Document
Report
51st Parliament
-
As concept design of the rebuilt Marion Ambulance Station progressed, it was identified that the
existing station land presented challenges due to the narrow, long, linear nature of the site, and a site
crossfall of approximately 2.5 metres from East to West, as well as the site being bounded by roads
on three sides, with an elevated train line to the East.
Presented by
Hon L P Hood
on
17/06/2025
-
It is intended to tender
the project in early 1995 for construction over a 22 month period, with occupation anticipated
as early as January 1997.
2.2 SITE INSPECTION
On 9 November 1994, the Public Works Committee travelled to the site of the proposed
University of South Australia City West Campus Project.
-
The site is nearly flat.
-
Kotz, M.P.) concerning the Aboriginal Heritage Site Database.
-
This project also includes the preparation of the site works
for the Adelaide International Rose Garden.
-
Construction and laydown zones will be appropriately established to minimise the potential
for surface runoff to enter the site, alongside controls used to minimise potential for runoff to leave
the site.
Presented by
Hon M E Brown
on
30/04/2024