We found 25524 search results for 'submissions dolphins':
For performance, only the first 1,000 results can be browsed. Refine your search to narrow the results.
-
Dolphins at Goolwa completed by the Engineer-
in- Chief's Department; inspection of boat
harbor for Wallaroo.
-
. ; Federal
Wharf, rebuilt ; new boilers for gantries sup-
plied ; three dolphins erected at Explosives
Berth, Wharf E, end of No. 2 Quay, and
sheet piling, T head ; road constructed south
side canal ; plant purchased for wharf con-
struction ; Commonwealth Oil Refining
buildings removed ; rebuilding Osborne
Wharf, in hand ; floating unlosders provided
at Osborne ; mobile cranes purchased ; land
reclaimed No. 2 Quay ; south side No. 2
Quay strengthened ; flooring ore bins at Port
Pirie in hand.
-
Contingencies
Additional machinery and appliances for workshops .. 608 0 0
Construction of one locomotive engine complete, with frame and parts in stock 1,800 0 0
Strong room, Locomotive Engineer's. office .. .. 80 0 0
Gawler running shed, Extension of .. .. .. .. .. 42 0 0
Reservoir, Manoora To complete .. 70 0 0
Crossing between Salisbury and Smithfield 110 0 0
Dolphins for Jervois Bridge .. 800 0 :
Steel rollers for Jervois Bridge . .. .. 00 960 0 (
Electric signals on approaches to Jervois Bridge 75 0 0
Cast -iron tank, Hallett, Erection of .. .. 535 0 0
Relaying line between Riverton and Burra (first instalment) .. . . 10,000 0 0
Relaying line as far as Riverton To complete.. .. .. . '1,872 0 0
Relaying wharf lines, Port Adelaide (first instalment) .. .. .. .. 3,000 0 0
Altering second and third class carriages, North Line .. .. . . 1,400 0 0
Total Port and North Lines 21,352 0 0
7
Class.
-
The 2006 Review of the Disclosure Provisions of the
Franchising Code of Conduct found, however, that, ‘A number of submissions from
23
franchisees expressed concern about the level and extent of action by the ACCC to
deal with claims of breaches of the Code by franchisors.’ 30 A franchising
‘consultative panel’ meets periodically to enable the sector participants to consult
with the regulator, but there is no prescribed procedure for monitoring the
effectiveness of the Code.
Standing Committees
54th Parliament
-
Therefore
it is dependant on a resolution of a Committee for certain evidence to be
received in camera and not to publish immediately submissions and documents
that have been Tabled.
????????????????
-
Tourists have a world class
experience with Baird Bay Ocean & Eco Tours by swimming with the sealions and dolphins
in the wild.
Presented by
Hon Jack Snelling
on
05/12/2006
Document
Annual Report
51st Parliament
-
Tourists have the opportunity to swim with sealions and dolphins.
Presented by
Hon I P Lewis
on
16/02/2004
Document
Annual Report
50th Parliament
-
Tourists have a
world class experience swimming with the sealions and dolphins in the wild.
Presented by
Hon Michael Atkinson
on
05/02/2013
Document
Annual Report
52nd Parliament
-
Comprising 38 detailed chapters, its contents cover a wide variety of physical and
biological topics from geology, to oceanography, fringing mangroves and salt marshes,
and fauna and flora from plankton to dolphins, whales and seabirds.
Standing Committees
55th Parliament
-
Four new dolphins have been erected by
contract at Jervois Bridge.