-
A parcel being used for
equestrian purposes has been subdivided from the overall airport site
Presented by
Hon Michael Atkinson
on
06/05/2014
Document
Annual Report
53rd Parliament
-
The site is nearly flat.
-
Design and site plans for this project are contained in Attachment
1 of this report.
-
There was an increase in the number of visiting caravans and in the site nights occupied, being
8 872 caravans and 78 477 site nights in 1981 -1982 as compared with comparable figures, namely 8 537
caravans and 77 488 site nights in 1980 -1 981.
-
• There have been some organisational changes within Santos, Dan Hayward is
now the Plant Manager and is based in Adelaide and is on site one to two times a
Coultto
LaidOnTableNew
2
OFFICIAL
OFFICIAL
month.
Presented by
Hon A Koutsantonis
on
12/11/2024
Document
Annual Report
55th Parliament
-
The CEMP or any Site Environmental Management
Plan will be monitored via regular site inspections and environmental audits.
Presented by
Ms Hutchesson
on
16/06/2026
Document
56th Parliament (Current)
-
The opening in May, 1979, of the final section of the South Eastern Freeway along the southern
boundary of the designated site resulted in an initial reduction in the volume of heavy traffic using
the old Princes Highway, which traverses the site.
-
This reporting period saw mobile devices make up nearly 10% of the total site traffic, with users
accessing the Zero Waste SA site from phones and tablets in increasing numbers.
Presented by
Hon Paul Caica
on
13/11/2012
Document
Annual Report
52nd Parliament
-
A Site Environmental Management Plan will be
developed to address site-specific environmental conditions.
Presented by
Ms Savvas
on
11/11/2025
-
Kotz, M.P.) concerning the Aboriginal Heritage Site Database.