Department for Education 3
Enrolments
2.5 Glenelg Primary School had 760 enrolments based on February 2021 verified
census data.
3 SITE OWNERSHIP DETAILS
3.1 All works are to take place on the Glenelg Primary School site.
3.2 There is one Certificate of Title for this site which is:
• Volume 6079 Folio 360.
3.3 This title is registered in the name of the Minister for Education.
Presented by
Mr Sam Duluk
on
16/11/2021
-
has its own site card.
Presented by
Mr E J Hughes
on
13/06/2023
-
The site is nearly flat.
-
At the inspection of the site it was noted that there are numerous old buildings on the site in a
bad state of repair which will require demolition.
-
The Wavelength Report ranked potential sites in order of site suitability.
Presented by
Hon Andrea Michaels
on
18/11/2021
-
JONES, Acting Government Printer, South Australia
1998
J
CONTENTS
THE PUBLIC WORKS COMMITTEE 2
THE FUNCTIONS OF THE COMMITTEE 2
PART ONE PREAMBLE AND PROJECT SUMMARY 3
1.1 TERM OF REFERENCE 3
1.2 FURTHER REPORTING TO THE COMMITTEE 4
1.3 SCOPE OF THIS REPORT 4
1.4 PROJECT BACKGROUND 5
PART TWO: EVIDENCE PRESENTED TO THE COMMITTEE 6
2.1 THE CURRENT PROPOSAL 6
2.2 CONSULTATION AND APPROVALS 7
2.3 ABORIGINAL HERITAGE 8
2.4 HERITAGE BUILDINGS 8
2.5 SITE INSPECTION 8
PART THREE: FINDINGS OF THE COMMITTEE 9
3.1 PROJECT JUSTIFICATION 9
3.2 PUBLIC VALUE OF THE PROPOSED PROJECT 10
3.3 REVENUE EARNING CAPACITY OF PROPOSED PROJECT 10
3.4 WHOLE LIFE COSTS OF THE PROJECT 10
3.5 ESTIMATED NET EFFECT OF THE WORK, AND ITS USE, ON PUBLIC FUNDS 12
3.6 THE EFFICIENCY AND PROGRESS OF THE PROJECT AND JUSTIFICATION OF ANY EXPENDITURE 14
PART FOUR : CONCLUSION & RECOMMENDATION 15
PART FIVE : ATTACHMENTS 14
5.1 LIST OF WITNESSES AND SUBMISSIONS 14
Public Works Committee 1 Playford B Power Station
-
Risks identified include construction
works being carried out in proximity to an operational clinical environment (requiring clear, ongoing
communication with site management and attending patients), the removal of asbestos under
controlled removal conditions, and careful management of the project to align with the approved
budget.
Presented by
Hon M E Brown
on
30/04/2024
-
There was an increase in the number of visiting caravans and in the site nights occupied, being
8 872 caravans and 78 477 site nights in 1981 -1982 as compared with comparable figures, namely 8 537
caravans and 77 488 site nights in 1980 -1 981.
-
• There have been some organisational changes within Santos, Dan Hayward is
now the Plant Manager and is based in Adelaide and is on site one to two times a
Coultto
LaidOnTableNew
2
OFFICIAL
OFFICIAL
month.
Presented by
Hon A Koutsantonis
on
12/11/2024
Document
Annual Report
55th Parliament
-
SITE OWNERSHIP DETAILS
The AACD will be built within Park 2.
Presented by
Hon M E Brown
on
17/10/2023