Clear filters
Expand All
Collapse All

We found 7660 search results for 'Legit Dumps Site : ':

  • Department for Education 3 Enrolments 2.5 Glenelg Primary School had 760 enrolments based on February 2021 verified census data. 3 SITE OWNERSHIP DETAILS 3.1 All works are to take place on the Glenelg Primary School site. 3.2 There is one Certificate of Title for this site which is: • Volume 6079 Folio 360. 3.3 This title is registered in the name of the Minister for Education.
    Presented by
    Mr Sam Duluk
    on
    16/11/2021
  • Tabled Paper Inquiry into Aboriginal Heritage (pdf 24.41 MB)

    has its own site card.
    Presented by
    Mr E J Hughes
    on
    13/06/2023
  • Tabled Paper Adelaide Remand Centre - Brompton (pdf 2.64 MB)

    The site is nearly flat.
    Presented
    on
    09/02/1982
  • At the inspection of the site it was noted that there are numerous old buildings on the site in a bad state of repair which will require demolition.
    Presented
    on
    24/08/1982
  • Tabled Paper Final Report (pdf 18.85 MB)

    The Wavelength Report ranked potential sites in order of site suitability.
    Presented by
    Hon Andrea Michaels
    on
    18/11/2021
  • Tabled Paper Playford - B Power Station Upgrade (pdf 1.07 MB)

    JONES, Acting Government Printer, South Australia 1998 J CONTENTS THE PUBLIC WORKS COMMITTEE 2 THE FUNCTIONS OF THE COMMITTEE 2 PART ONE PREAMBLE AND PROJECT SUMMARY 3 1.1 TERM OF REFERENCE 3 1.2 FURTHER REPORTING TO THE COMMITTEE 4 1.3 SCOPE OF THIS REPORT 4 1.4 PROJECT BACKGROUND 5 PART TWO: EVIDENCE PRESENTED TO THE COMMITTEE 6 2.1 THE CURRENT PROPOSAL 6 2.2 CONSULTATION AND APPROVALS 7 2.3 ABORIGINAL HERITAGE 8 2.4 HERITAGE BUILDINGS 8 2.5 SITE INSPECTION 8 PART THREE: FINDINGS OF THE COMMITTEE 9 3.1 PROJECT JUSTIFICATION 9 3.2 PUBLIC VALUE OF THE PROPOSED PROJECT 10 3.3 REVENUE EARNING CAPACITY OF PROPOSED PROJECT 10 3.4 WHOLE LIFE COSTS OF THE PROJECT 10 3.5 ESTIMATED NET EFFECT OF THE WORK, AND ITS USE, ON PUBLIC FUNDS 12 3.6 THE EFFICIENCY AND PROGRESS OF THE PROJECT AND JUSTIFICATION OF ANY EXPENDITURE 14 PART FOUR : CONCLUSION & RECOMMENDATION 15 PART FIVE : ATTACHMENTS 14 5.1 LIST OF WITNESSES AND SUBMISSIONS 14 Public Works Committee 1 Playford B Power Station
    Presented
    on
    08/12/1998
  • Risks identified include construction works being carried out in proximity to an operational clinical environment (requiring clear, ongoing communication with site management and attending patients), the removal of asbestos under controlled removal conditions, and careful management of the project to align with the approved budget.
    Presented by
    Hon M E Brown
    on
    30/04/2024
  • Tabled Paper West Beach Trust (pdf 431 KB)

    There was an increase in the number of visiting caravans and in the site nights occupied, being 8 872 caravans and 78 477 site nights in 1981 -1982 as compared with comparable figures, namely 8 537 caravans and 77 488 site nights in 1980 -1 981.
    Presented
    on
    05/10/1982
  • • There have been some organisational changes within Santos, Dan Hayward is now the Plant Manager and is based in Adelaide and is on site one to two times a Coultto LaidOnTableNew 2 OFFICIAL OFFICIAL month.
    Presented by
    Hon A Koutsantonis
    on
    12/11/2024
  • Tabled Paper Adelaide Aquatic Centre Development (pdf 2.63 MB)

    SITE OWNERSHIP DETAILS The AACD will be built within Park 2.
    Presented by
    Hon M E Brown
    on
    17/10/2023
Acknowledgement of Country

The Parliament of South Australia acknowledges Aboriginal and Torres Strait Islander peoples as the traditional owners of this country throughout Australia, and their connection to land and community. We pay our respect to them and their cultures and to the Elders both past and present.