-
A Site Environmental Management Plan will be
developed to address site-specific environmental conditions.
Presented by
Hon L W Bignell
on
03/12/2024
-
In
early 2021, the operators of a landfill site in McLaren Vale sought approval from the Environmental
Protection Authority (EPA) to receive PFAS wastes.
Presented by
Ms Stinson
on
29/08/2023
-
Staff have also undertaken mentoring and
site visits to other regions.
Presented by
Hon Lea Stevens
on
03/12/2003
Document
Report
50th Parliament
-
A Site
Environmental Management Plan will be developed to address site-specific environmental conditions.
Presented by
Ms Savvas
on
11/11/2025
-
Number of interviews were conducted by the review panel by video conference.
2.3.2.2 Site visits
Site visits were prearranged through support from the OCP staff and undertaken between the 20-25
June 2022 (refer Appendix D for a list of the sites visited by the review team).
Presented by
Hon C J Picton
on
14/09/2023
Document
Report
55th Parliament
-
has its own site card.
Presented by
Mr E J Hughes
on
13/06/2023
-
The Committee inspected the site for the proposed new school buildings.
-
ABC has made several improvements during 2007−08 to reduce dust emissions from the site.
Presented by
Hon Jay Weatherill AO
on
27/11/2008
Document
Annual Report
51st Parliament
-
SITE AND OWNERSHIP DETAILS ......................................................... 4
3.
Presented by
Hon L P Hood
on
19/08/2025
-
A Site Environmental Management
Plan (SEP) will be developed to address site specific requirements.
Presented by
Hon M E Brown
on
27/08/2024