-
This will allow the three existing Whyalla
secondary schools to amalgamate and consolidate onto one site.
Presented by
Hon Dan Cregan
on
12/12/2019
-
This unit will be a new built
component adjacent to the emergency department created as part of Stage A
Car parking and Site Works
The proposal provides additional permanent car parks on the LMH site and bordering streets to
meet current and anticipated demand associated with providing access to services on the site
Presented by
Ms Vini Ciccarello
on
22/11/2006
Document
Report
51st Parliament
-
Site C: The proposed site for the Nelwart Street Bridge.
Presented by
Hon M E Brown
on
29/11/2022
-
Site Contamination Auditor Accreditation Committee
The Site Contamination Auditor Accreditation Committee was established in August 2008 to advise the Board on the
accreditation of site contamination auditors.
Presented by
Hon Paul Caica
on
10/11/2011
Document
Annual Report
52nd Parliament
-
Upon considering the HaIlion Report the Government decided to develop
the New WCH on the Barracks Site instead of the formerly selected RAH West
site.
Presented by
Hon D R Cregan
on
06/02/2024
-
The site
selected for the desalination plant is in upper Spencer Gulf within a region believed to
experience slow turnover and also recognised as the site of the only known mass
aggregation of spawning Giant Australian Cuttlefish (Sepia apama) in the world, the
eggs of which would be impacted by increased salinity.
Presented by
Hon Lyn Breuer OAM
on
08/09/2009
-
.%2014_4%20March%202021.docx#id101bf839_6efc_44b5_8c4f_322e863b75ab_6
forkejo
LaidOnTableNew
2
5—Insertion of Schedule 6A
After Schedule 6 insert:
Schedule 6A—Accepted development
1—Horticultural netting
(1) The construction or alteration of, or addition to, a protective tree netting
structure on a site if—
(a) no part of the protective tree netting structure will be more than
6 m above ground level (depending on where it is situated); and
(b) netting visible from the outside of the protective tree netting
structure is of a low light-reflective nature, and, in the case of a
structure that has side netting, the side netting is of a dark colour;
and
(c) in the case of a development on a site that is within a Hazards
(Bushfire—General Risk) Overlay, Hazards (Bushfire—High
Risk) Overlay, Hazards (Bushfire—Medium Risk) Overlay,
Hazards (Bushfire—Outback) Overlay, Hazards (Bushfire—
Regional) Overlay or Hazards (Bushfire—Urban Interface)
Overlay under the Planning
Presented by
Hon Vickie Chapman
on
16/03/2021
-
Site Ownership Details
All works are to take place on the Roma Mitchell Secondary College site.
Presented by
Hon Dan Cregan
on
04/03/2021
-
The Goodman Court site comprised 52 dwellings in six two-storey buildings, constructed in 1953.
Presented by
Hon Dan Cregan
on
21/03/2019
-
• In 2022–23 accredited site auditors issued 221 site audit statements following 169 statutory audits and
52 non-statutory audits under the Act
Presented by
Hon L P Hood
on
02/06/2026
Document
Annual Report
56th Parliament (Current)