-
This funding allocation was confirmed on the change of government in March
2018.
1.3 The redevelopment will consist of demolition and new works to accommodate
448 students on the Warradale Primary School site.
1.4 The project has considered the requirements of the Disability Discrimination Act
1992 (DDA) with respect to making provision for persons with disabilities.
Presented by
Mr Sam Duluk
on
02/12/2021
-
• A 100kW solar photovoltaic (PV) system was installed on site in 2018 as part of the
Sustainable Schools Program (SSP).
Presented by
Hon Dan Cregan
on
23/07/2020
-
This project also includes the preparation of the site works
for the Adelaide International Rose Garden.
-
Construction and laydown zones will be appropriately established to minimise the potential
for surface runoff to enter the site, alongside controls used to minimise potential for runoff to leave
the site.
Presented by
Hon M E Brown
on
30/04/2024
-
Site Ownership
The site at Lonsdale is owned by SA Water, the owners and operators of the Adelaide Desalination
Plant.
Presented by
Hon Michael Atkinson
on
26/09/2017
-
[ ]
(d) a copy of a site contamination audit report?
Presented by
Hon A Michaels
on
19/08/2025
-
You know the site of the Sydney University ?
-
Plans showing the development site form an
attachment to this report.
-
• Upskilling additional nursing staff at each metro site to
undertake peripherally Inserted Central Catheter (PICC)
insertions to avoid service disruption
Presented by
Hon C J Picton
on
17/11/2022
Document
Annual Report
55th Parliament
-
The PAR for the Wirrina Cove site was authorised by the
Governor on 30 March 1995, thereby becoming part of the Development Plan.