-
Community
Improve the amenity of the site for the wider community;
Aesthetically improve the presentation of the site.
Presented by
Mrs Annabel Digance
on
01/12/2016
-
The project site includes a
significant area inside the Coongie Lakes
RAMSAR Reserve which is part of the complex
and extensive freshwater wetland system in an
arid zone.
Presented by
Hon A Koutsantonis
on
14/11/2023
Document
Compliance Report
55th Parliament
-
The site is contained within Certificate of Title Volume 6182 Folio 891.
Presented by
Hon M E Brown
on
06/02/2024
-
A Site Environmental Management Plan will be
developed to address site-specific environmental conditions.
Presented by
Hon M E Brown
on
26/11/2024
-
Site ownership details
All works are to take place on the Port Lincoln High School site.
Presented by
Hon Vincent Tarzia
on
28/04/2020
-
Construction issues
The site is relatively flat so there is not expected to be many construction issues.
Presented by
Hon Vincent Tarzia
on
28/04/2020
-
There is ageing accommodation at the school site requiring demolition and replacement with new
facilities.
Presented by
Hon Dan Cregan
on
02/07/2020
-
Overview of Agency Reporting
Historically agencies have managed asbestos at a site level where asbestos registers are
held.
Presented by
Hon Stephen Mullighan
on
14/11/2017
Document
Annual Report
53rd Parliament
-
Shop drawings and shop fabrication minimize fabrication shop wastage and site
cutting and waste.
Presented by
Mrs Annabel Digance
on
22/03/2016
-
• Stormwater re-use—encouraging opportunities for the on-site retention of stormwater and/or
beneficial use of stormwater
Presented by
Hon Dan Cregan
on
31/05/2018