-
怎样服用补铁药片?
Select Committees
53rd Parliament
-
Figure 2: Proposed Zoning and Area Affected
Figure 1: Current Zoning and Area Affected
如果你想要此信息的翻译版本,请联系我们,
电话是8333 7999 ,或发邮件至
feedback@codeamendments.com.au
What zoning is proposed?
Standing Committees
54th Parliament
-
Figure 2: Proposed Zoning and Area Affected
Figure 1: Current Zoning and Area Affected
如果你想要此信息的翻译版本,请联系我们,
电话是8333 7999 ,或发邮件至
feedback@codeamendments.com.au
What zoning is proposed?
Standing Committees
55th Parliament (Current)
-
Reduction of Transport Noise
Reduction of Traffic Noise No change to the current situation
Complies with noise guidelines
Minimisation of Air Emissions
Minimisation of Harmful Air Emissions
on a Local Scale
Decreased traffic delays and hence
reduced emissions from vehicular traffic
Reduction of Greenhouse Gasses As above
Dual circuit lighting utilised to minimise
energy consumption and hence
greenhouse gas emissions
Sustainable
G:\Offices\Committees\Public Works\References\Current References\Marion Oaklands Interchange\App C - Sustainability Management Plan.doc
Support and Encouragement of Social and Community Involvement and Consultation
Establishment of Relationships with
the Community, Stakeholders,
Customers and Suppliers to Achieve
Environmental Goals and Objectives
Extensive consultation undertaken with
the community
Primary Industries and Resources SA
engaged to provide specialist advice in
relation to environmental issues
Standing Committees
52nd Parliament
-
12.6 m²
PB6-G8
PB4
PB3
2200
2200
2200
2200
PRIMARY
BUILDING 4
PRIMARY
BUILDING 3
LEGEND
EXISTING BUILDING OUTLINE
SITE BOUNDARY
REFERENCE TO ANOTHER DRAWING
EXISTING ADMIN BUILDING 6
REFER DRW SK2004
NEW BUILDING OUTLINE
NEW SPECIAL PLANTING AREA
NEW PAVING - TYPE 1
NEW PAVING - TYPE 2
NEW CARPARK SURFACE
NEW LAWN &/OR PLANTING BED
LEGEND
PRIMARY BUILDING 1PB1
PB2
PB3
PB4
PB5
PB6
PB7
TR
CPC
SB1
SB2
SB3
SB4
SB4A
SB5
SB5A
SB6
PRIMARY ADMINISTRATION
PRIMARY BUILDING 2
PRIMARY ACTIVITY HALL & JAPANESE LEARNING AREA
PRIMARY BUILDING 3
PRIMARY GENERAL LEARNING AREAS
PRIMARY BUILDING 4
PRIMARY GENERAL LEARNING AREAS
PRIMARY BUILDING 5
PRIMARY GENERAL LEARNING AREAS
PRIMARY BUILDING 6
PRIMARY GENERAL LEARNING AREAS
PRIMARY BUILDING 7
PRIMARY GENERAL LEARNING AREAS
PRIMARY TRANSPORTABLE BUILDINGS
PRIMARY GENERAL LEARNING AREAS
CHILD PARENT CENTRE
CHILD PARENT CENTRE TRANSPORTABLE & OUTDOOR PLAY
AREAS
SECONDARY BUILDING 1
SECONDARY ADMINISTRATION
Standing Committees
55th Parliament (Current)
-
12.6 m²
PB6-G8
PB4
PB3
2200
2200
2200
2200
PRIMARY
BUILDING 4
PRIMARY
BUILDING 3
LEGEND
EXISTING BUILDING OUTLINE
SITE BOUNDARY
REFERENCE TO ANOTHER DRAWING
EXISTING ADMIN BUILDING 6
REFER DRW SK2004
NEW BUILDING OUTLINE
NEW SPECIAL PLANTING AREA
NEW PAVING - TYPE 1
NEW PAVING - TYPE 2
NEW CARPARK SURFACE
NEW LAWN &/OR PLANTING BED
LEGEND
PRIMARY BUILDING 1PB1
PB2
PB3
PB4
PB5
PB6
PB7
TR
CPC
SB1
SB2
SB3
SB4
SB4A
SB5
SB5A
SB6
PRIMARY ADMINISTRATION
PRIMARY BUILDING 2
PRIMARY ACTIVITY HALL & JAPANESE LEARNING AREA
PRIMARY BUILDING 3
PRIMARY GENERAL LEARNING AREAS
PRIMARY BUILDING 4
PRIMARY GENERAL LEARNING AREAS
PRIMARY BUILDING 5
PRIMARY GENERAL LEARNING AREAS
PRIMARY BUILDING 6
PRIMARY GENERAL LEARNING AREAS
PRIMARY BUILDING 7
PRIMARY GENERAL LEARNING AREAS
PRIMARY TRANSPORTABLE BUILDINGS
PRIMARY GENERAL LEARNING AREAS
CHILD PARENT CENTRE
CHILD PARENT CENTRE TRANSPORTABLE & OUTDOOR PLAY
AREAS
SECONDARY BUILDING 1
SECONDARY ADMINISTRATION
Standing Committees
52nd Parliament
-
77.26 m²
CPC-G05
ACTIVITY
10.85 m²
CPC-G01
TOILETS
37.90 m²
CPC-G02
WITHDRAWAL
16.89 m²
CPC-G03
STORE
21.70 m²
CPC-G04
STAFF
6.73 m²
CPC-G09
ACCESS WC
20.38 m²
CPC-G08
FOYER
3.22 m²
CPC-G07
CLNR
11.01 m²
CPC-G06
KITCHEN
13.18 m²
PB1-11
Access WC
38.27 m²
PB1-9
Canteen
1.81 m²
PB1-26
Store
11.6 m²
PB6-G15
11.8 m²
PB7-G4
STORE 2
5.0 m²
PB7-G5
STORE 1
48.1 m²
PB7-G3
WET AREA
80.3 m²
PB7-G2
GLA 3
16.0 m²
PB7-G1
EAST ENTRY19.4 m²
PB7-G7
BREAKOUT SPACE
16.4 m²
PB7-G6
WEST ENTRY
12.6 m²
PB7-G8
TEACHER PREP
67.9 m²
PB7-G9
GLA 2
67.9 m²
PB7-G10
GLA 1
12.3 m²
PB7-G16
GIRLS WC
11.6 m²
PB7-G15
BOYS WC
RETAIN OUTDOOR
LEARNING AREA
PRIMARY GLAS
PB6
PB7
CPC
PB1
NEW CPC PLAY
(SHOWN CROSSHATCHED)
N
E
W
E
N
T
R
Y
P
A
V
IN
G
RETAIN
EXISTING TREE
RETAIN EXISTING
PLAY AREA
2200
2200
2200
1300mm HIGH FENCING (EXISTING - REINSTATED)
TL
TL
TL
1300
1
8
00
m
m
H
IG
H
F
EN
C
IN
G
(
N
EW
)
1
3
00
m
m
H
IG
H
F
Standing Committees
55th Parliament (Current)
-
77.26 m²
CPC-G05
ACTIVITY
10.85 m²
CPC-G01
TOILETS
37.90 m²
CPC-G02
WITHDRAWAL
16.89 m²
CPC-G03
STORE
21.70 m²
CPC-G04
STAFF
6.73 m²
CPC-G09
ACCESS WC
20.38 m²
CPC-G08
FOYER
3.22 m²
CPC-G07
CLNR
11.01 m²
CPC-G06
KITCHEN
13.18 m²
PB1-11
Access WC
38.27 m²
PB1-9
Canteen
1.81 m²
PB1-26
Store
11.6 m²
PB6-G15
11.8 m²
PB7-G4
STORE 2
5.0 m²
PB7-G5
STORE 1
48.1 m²
PB7-G3
WET AREA
80.3 m²
PB7-G2
GLA 3
16.0 m²
PB7-G1
EAST ENTRY19.4 m²
PB7-G7
BREAKOUT SPACE
16.4 m²
PB7-G6
WEST ENTRY
12.6 m²
PB7-G8
TEACHER PREP
67.9 m²
PB7-G9
GLA 2
67.9 m²
PB7-G10
GLA 1
12.3 m²
PB7-G16
GIRLS WC
11.6 m²
PB7-G15
BOYS WC
RETAIN OUTDOOR
LEARNING AREA
PRIMARY GLAS
PB6
PB7
CPC
PB1
NEW CPC PLAY
(SHOWN CROSSHATCHED)
N
E
W
E
N
T
R
Y
P
A
V
IN
G
RETAIN
EXISTING TREE
RETAIN EXISTING
PLAY AREA
2200
2200
2200
1300mm HIGH FENCING (EXISTING - REINSTATED)
TL
TL
TL
1300
1
8
00
m
m
H
IG
H
F
EN
C
IN
G
(
N
EW
)
1
3
00
m
m
H
IG
H
F
Standing Committees
52nd Parliament
-
The maximum winter peak is still 2142 MW (2000)
Source: NEMMCO
SUMMER ELECTRICITY DEMANDSUMMER ELECTRICITY DEMANDSUMMER ELECTRICITY DEMANDSUMMER ELECTRICITY DEMAND
SUMMER DEMAND 2003
850
1000
1150
1300
1450
1600
1750
1900
2050
2200
2350
2500
2650
2800
2950
3100
3250
1/12/02
8/12/02
15/12/02
22/12/02
29/12/02
5/01/03
12/01/03
19/01/03
26/01/03
2/02/03
9/02/03
16/02/03
23/02/03
M
W
SUMMER DEMAND 2001
850
1000
1150
1300
1450
1600
1750
1900
2050
2200
2350
2500
2650
2800
2950
1/12/00
8/12/00
15/12/00
22/12/00
29/12/00
5/01/01
12/01/01
19/01/01
26/01/01
2/02/01
9/02/01
16/02/01
23/02/01
M
W
Source: NEMMCO
The average maximum temperature for the summer of 2001 was the highest since 1905
AVERAGE SUMMER DEMAND AS % AVERAGE SUMMER DEMAND AS % AVERAGE SUMMER DEMAND AS % AVERAGE SUMMER DEMAND AS %
OF INSTALLED CAPACITYOF INSTALLED CAPACITYOF INSTALLED CAPACITYOF INSTALLED CAPACITY
Source: NEMMCO
* Using 1999-00 summer capacity
** Overall rather than summer capacity
Standing Committees
54th Parliament
-
The maximum winter peak is still 2142 MW (2000)
Source: NEMMCO
SUMMER ELECTRICITY DEMANDSUMMER ELECTRICITY DEMANDSUMMER ELECTRICITY DEMANDSUMMER ELECTRICITY DEMAND
SUMMER DEMAND 2003
850
1000
1150
1300
1450
1600
1750
1900
2050
2200
2350
2500
2650
2800
2950
3100
3250
1/12/02
8/12/02
15/12/02
22/12/02
29/12/02
5/01/03
12/01/03
19/01/03
26/01/03
2/02/03
9/02/03
16/02/03
23/02/03
M
W
SUMMER DEMAND 2001
850
1000
1150
1300
1450
1600
1750
1900
2050
2200
2350
2500
2650
2800
2950
1/12/00
8/12/00
15/12/00
22/12/00
29/12/00
5/01/01
12/01/01
19/01/01
26/01/01
2/02/01
9/02/01
16/02/01
23/02/01
M
W
Source: NEMMCO
The average maximum temperature for the summer of 2001 was the highest since 1905
AVERAGE SUMMER DEMAND AS % AVERAGE SUMMER DEMAND AS % AVERAGE SUMMER DEMAND AS % AVERAGE SUMMER DEMAND AS %
OF INSTALLED CAPACITYOF INSTALLED CAPACITYOF INSTALLED CAPACITYOF INSTALLED CAPACITY
Source: NEMMCO
* Using 1999-00 summer capacity
** Overall rather than summer capacity
Standing Committees
55th Parliament (Current)